Active Projects

Idaho Springs Area

Soda Creek Road

  • Anticipated Completion Summer 2022

Replace culverts and overlay pavement surface from boundary of Idaho Springs to the Clear Creek County Transfer Station.  Elite Surface Infrastructure plans to construct the project improvements during the months of September and October.

This project will include significant traffic disruptions and delays should be expected.

Floyd Hill Area

Stormwater Drainage Evaluation

  • Anticipated Completion - Summer 2022

The purpose of the Floyd Hill Stormwater Drainage Evaluation is to define the existing 2-year, 10-year, 25-year, and 100-year annual exceedance probability deficiencies and improvements necessary to convey the appropriate annual exceedance probability flood with the open channels and major conduit systems under the County’s jurisdiction.

The project includes, but is not limited to, the compilation of existing data and collection of new data as necessary to determine the existing capacity of the County’s stormwater infrastructure within public rights-of-way in order to develop the most feasible drainage, water quality, and flood control design alternatives for the Floyd Hill area.

Pine Valley Area

Old S**** Pass Road Water Quality Improvements and Erosion Mitigation

  • Completed Evaluation and Schematic Design – Fall 2021
  • Anticipated Completion of Constructed Improvement – Summer 2022

Evergreen Area

Witter Gulch Road

  • Anticipated Completion Summer 2022

Mitigation of road damage near Juniper Lane due to poor drainage/frost heave